WMD

WMD Training Applied Instruction Facility, Eglin Air Force Base, Florida

 

The STOA design team provided full design services for a new multi-building training and applied instruction compound at Eglin Air Force Base as part of a Design-Build award.  The project included the design and construction of 9 command posts, 9 blast pits, 1 toilet facility, and 16 mock training facilities. The facilities represent various types of residential, commercial businesses, public transportation, and utility infrastructure for a new Weapons of Mass Destruction training program at the installation. The facilities include moveable furnishings and various furniture, fixtures, and equipment to provide a fully immersive training environment. The training facilities total 35,964 SF and are constructed on 9 individual sites that make up the overall training compound. 

Size: 35,964SF

Cost: $13.7M